Sep 14 – 16, 2022
IIA Bangalore
Asia/Kolkata timezone
Poster Size for META 2022 : A0 Size Poster is preferred as fixing board size at IIA is 56 inches x 46 inches (landscape orientation)

1.3m Telescope Current Status and Future Up gradation Plans

Not scheduled
20m
IIA Bangalore

IIA Bangalore

Speakers

Mukeshkumar Jaiswar (bachelor of engineering in Electronics and Telecommunication) Kumar T. S. (ARIES)

Description

1.3m Telescope Current Status and Future Up gradation Plans

Mukeshkumar Jaiswar 1, TS Kumar 1 and Shobhit Yadav 1

1 ARIES, Manora Peak, Nainital-263001

Corresponding Author(s): mukesh@aries.res.in, kumar@aries.res.in

Abstract: 1.3m DFM Telescope has been installed at ARIES Devasthal site in the year 2010. It is more than 10 Years old telescope most of its component has been obsoleted and for smooth functioning of telescope it requires future up gradation. Initially, we would like to start with Its RA and DEC motion up gradation. DFM has provided analog card based PID controller to control RA and DEC motion in 1.3m telescope and It has Galil Controller and it is has manual tuning (Pot Based) method to achieve performance. It will be upgraded with Omron CK3M based industrial grade controller. Laboratory based motion test setup has been developed and is being utilized for evaluating CK3M controller.

Presentation type Oral

Primary authors

Mukeshkumar Jaiswar (bachelor of engineering in Electronics and Telecommunication) Kumar T. S. (ARIES)

Co-author

shobhit yadava (ARIES Nainital - 263001)

Presentation materials

There are no materials yet.